So once the wall was removed where the new extension is going, it was time to prep the new and existing areas for new concrete foundations and slab floors. This started with digging out, then leveling and adding sand and crushed stone, and ended with the addition of steel reinforcements, before the cement truck made 3 trips up to the hill to pour the slabs. Once poured, they cured for a week before blocks were delivered and the work started on the walls.